AZB-12 AN-07 · wit.notazizelse.xyz

← AN-07 WIT stratospheric payload

Technical document · AN-07

Where to buy everything

wit.notazizelse.xyz · assets/procurement/suppliers.md on GitHub

Three tiers. Use local first where quality is not critical, authorised distributors for anything that must be genuine, and JLCPCB/LCSC for the board and its machine-placed parts.


Tier 1 — Local, Tashkent

Fastest, no customs, no shipping. Good for passives, connectors, tools, generic modules and anything you will buy several of.

Supplier URL What they carry Use for
Microelectronica (electron.uz) https://electron.uz/ Broad electronic components, sensors, modules, tools, Raspberry Pi. Published price list. Passives, connectors, headers, tools, multimeter, tweezers, flux, ESD gear, generic modules
arduino.uz https://arduino.uz/ Arduino/Raspberry ecosystem, sensor modules, breakouts Sensor breakout boards for dev-board prototyping
NAG Uzbekistan https://shop.nag.uz/ Sensors and industrial components, Tashkent stock Industrial sensors, cabling
Nevel.uz https://nevel.uz/elektronnye-komponenty-174 General electronic components Passives, semiconductors
OLX.uz https://www.olx.uz/ Second-hand and small-trader listings Bench PSU, oscilloscope, freezer — used lab gear
Retail (supermarkets, photo shops) — Energizer Ultimate Lithium AA (L91) CONFIRMED available locally. Buy 8 cells (two flight sets).

What NOT to buy locally: the STM32, the IMU, the GNSS module, the MS5611, or any memory IC. Counterfeit and remarked parts circulate through informal channels, and a counterfeit IMU that half-works is the worst possible debugging experience. Those go through Tier 2 or Tier 3.


Tier 2 — Authorised distributors (genuine parts, ships worldwide)

Use for anything where authenticity matters or where the part is not in the JLCPCB library.

Supplier URL Ships to UZ Notes
Mouser https://www.mouser.com/ Yes, DHL/FedEx Best for Sensirion (SHT45, SPS30), ams OSRAM (AS7331), Fujitsu FRAM, Everspin MRAM, u-blox, Samtec. Free shipping threshold applies in many regions — check at checkout.
DigiKey https://www.digikey.com/ Yes — international shipping rates Same catalogue coverage as Mouser. Compare both; stock and price differ per line.
LCSC https://www.lcsc.com/ Yes — shipping cost calculator Cheapest for the STM32, ICM-42688-P, MS5611, W25Q128, passives. Same warehouse as JLCPCB, so ordering loose spares alongside a PCBA order is efficient.
Reichelt / Digi-Key EU https://www.reichelt.de/ Yes Carries Delock. Delock is a German brand — the EU distributors are the reliable route.

Customs. Expect Uzbek import duty and VAT on the declared value. Budget ~15–25 % on top of goods value plus shipping, and allow extra calendar days for clearance. Consolidate orders: three shipments of $300 cost far more in fees and delay than one of $900. This is a real schedule item, not an afterthought — put it in the plan.

Practical tip: if your university or a sponsor can act as the importer, clearance is usually faster and duty treatment may differ for educational equipment. Ask before you order.


Tier 3 — AliExpress

Confirmed acceptable to you for the Geiger module. Reasonable for a specific, limited category.

Fine to buy here: - RadiationD-v1.1 / CAJOE Geiger module with SBM-20 tube (confirmed orderable) - U.FL and SMA pigtails, SMA bulkheads, antennas - STM32F407VET6 "black board" dev boards - Logic analyser, tweezers, ESD mat, standoffs, Kapton tape - PT1000 probes on leads - 868 MHz Yagi

Do not buy here: - Any IC that goes on the PCB - The u-blox GNSS module (heavily counterfeited) - The IMU (heavily counterfeited) - microSD cards (fake capacity is endemic)

Lead time: 2–5 weeks to Tashkent. Order AliExpress items first, because they are the slowest and the least predictable.


Tier 4 — JLCPCB (board + assembly)

Item Detail
URL https://jlcpcb.com/
Order 5 boards, 4-layer, 1.6 mm, stackup JLC04161H-7628, ENIG finish, PCBA top side only
Parts Everything in BOM_pcb_jlcpcb.csv — all have LCSC numbers
Excluded Everything in BOM_handsolder.csv — you fit those yourself
Files Gerbers, Excellon drill, BOM CSV, CPL CSV — use the KiCad JLCPCB Fabrication Toolkit plugin
Lead time 5–8 days fab + assembly, then 4–8 working days DHL to Tashkent, plus customs
Before paying Use JLCPCB's online assembly preview and check pin-1 orientation on every polarised part. KiCad and JLCPCB rotation conventions disagree; this is the single most common first-order failure.

Verify stock before freezing the layout. JLCPCB stock is live. If a part sells out mid-order they substitute or halt the whole job.


Order sequence — what to buy today

Nothing in group 1 depends on the PCB being finished, and every item in it removes a schedule risk.

Today

# Item Supplier Why now
1 STM32F407VET6 dev board × 2 AliExpress Firmware development starts immediately and runs parallel to everything else. Highest-value $24 in the project.
2 Geiger module + SBM-20 × 1 AliExpress Longest and least predictable lead time.
3 u-blox SAM-M10Q × 2 Mouser / DigiKey Longest distributor lead-time risk, and you need one on the bench to write and test the UBX airborne-mode config.
4 MicoAir LR900-A × 2 MicoAir / distributor Stock already known to be uncertain. Start the clock.
5 Bench PSU + ST-LINK × 2 + multimeter + logic analyser electron.uz / OLX.uz / AliExpress Needed before the board arrives, not after.

This week

# Item Supplier
6 Sensor breakouts: MS5611, ICM-42688-P, SHT45, AS7331, TMP117 AliExpress + Mouser
7 Bare parts ×4 each: MS5611, ICM-42688-P, SHT45, AS7331, TMP117, FRAM Mouser / LCSC
8 Delock 12592 × 2 (flight + spare), 12593 × 1 (ground) Reichelt / Digi-Key
9 SPS30 × 1 Mouser / DigiKey
10 Energizer L91 AA × 8, holders × 2 Local Tashkent retail
11 Quartz or PTFE UV window Thorlabs / AliExpress / local optics

Once the layout is frozen

# Item Supplier
12 JLCPCB: 5 boards assembled + stencil JLCPCB
13 Loose spares ×2 of every hand-soldered part LCSC (same shipment as 12 if possible)
14 microSD industrial × 2 Mouser / DigiKey

Why order sensors before the PCB exists

Every sensor has a driver to write, a calibration to verify and a quirk to discover. Doing that on a dev board with breakouts, while the PCB is being laid out and fabricated, turns the fabrication wait from dead time into the bulk of your firmware schedule.

By the time the boards land you should be flashing known-good firmware and hunting hardware faults — not writing an I²C driver for the first time with a deadline behind you.